Concrete contractors in Sacramento County
Driveway · sidewalk · patio · slab · stamped · repair · retaining walls <4ft · $6-$15/sqft
Concrete is priced by the square foot, which makes it look simple and hides the two things that actually drive the bill: getting the old concrete out, and getting the truck to the pour.
Demolition and haul-away of an existing driveway frequently costs more than the new slab. And every pour carries a fixed mobilisation cost — the truck, the pump if one is needed, and the crew — which is why small jobs carry a minimum and why pouring two things on one visit is substantially cheaper than two separate visits.
What it costs in Sacramento County
What actually moves the price
Breaking out and legally disposing of existing concrete runs $7–9 per square foot. On a tear-out-and-replace driveway this is often more than half the job, and it is the line most competing bids leave vague.
If the mixer can chute directly into the forms, you pay for concrete. If it cannot, you pay for a pump — roughly $1,000 per pour — or for wheelbarrowing, which is slow and expensive. Backyard patios behind a narrow side yard are the usual case.
Mobilisation is fixed per visit. A driveway and a back patio poured on the same day share it; poured a month apart they do not. If you are planning both, doing them together is a real saving rather than a sales line.
Expansive clay is normal across the Sacramento Valley floor and moves with moisture. It needs proper base preparation and sometimes thicker slab or added reinforcement — skipping it is why so many local driveways crack in a regular pattern within a few years.
Four inches suits a patio or walkway. A driveway taking vehicle loads, and especially anything carrying an RV or a delivery truck, needs more thickness and heavier reinforcement. Extra depth runs about $1.35 per square foot per inch.
A slab must shed water away from the house. Where it cannot by slope alone, a trench drain runs about $117 per linear foot installed. Getting this wrong puts water against your foundation.
What is included — and what is not
- Layout, excavation and grading to drain away from the structure
- Compacted base, forms, reinforcement — mesh, fibre or rebar as the scope requires
- Concrete supplied, placed, finished and cured as specified
- Control joints saw-cut or tooled at proper spacing to manage cracking
- Site cleaned and all debris hauled and legally disposed
- Work performed by a licensed C-8 concrete subcontractor under Cutting Edge as prime, CSLB #1007180
- Permit fees where the jurisdiction requires a permit — paid at cost
- Soils or compaction testing where required by the jurisdiction
- Underground utility relocation
- Landscape and irrigation repair beyond backfilling and grading the work area
- Structural footings or retaining walls, which are engineered and quoted separately
How the job runs
- Site visit and measure1 visit
We measure, check truck access, look at where water currently goes and probe the existing base. Access is what we are really there to assess — it changes the price more than anything else.
- Demolition and haul1–2 days
Existing concrete broken out, loaded and legally disposed.
- Excavate, base and form1–2 days
Grade to drain, bring in and compact base material, set forms and place reinforcement. This stage decides whether the slab lasts.
- Pour and finish1 day
Placed, screeded, floated and finished to the specified texture. Finishing is time-critical and weather-dependent, which is why we will move a pour date rather than place in the wrong conditions.
- Cure, joints and clean3–7 days
Control joints cut, cured and sealed if specified. Keep off it for the stated cure time — full strength takes about 28 days even though it is walkable far sooner.
What is specific to building here
- Expansive clay soil is normal across the Sacramento Valley floor. It swells and shrinks with moisture, and it is the reason proper base preparation matters more here than in sandier regions. The regular transverse cracking you see on older Sacramento driveways is usually base failure, not bad concrete.
- Summer heat genuinely affects placement. Above roughly 95°F concrete sets faster than it can be finished, so we pour early and will reschedule rather than fight it — a rushed finish in July is a permanently poor surface.
- Many jurisdictions require a permit and an encroachment permit for work in the public right of way, which includes the sidewalk and the driveway approach. The approach is frequently city property even though it sits on your frontage.
- Standalone concrete work is performed by a licensed C-8 subcontractor under our General B licence, which is how California law structures a specialty scope primed by a general contractor.
Questions people actually ask
What does a concrete driveway cost in Sacramento?
Standard grey with a broom finish runs about $13 per square foot for new work, so a typical 600 sq ft driveway is around $7,800. If existing concrete has to come out, add roughly $7–9 per square foot for demolition and disposal, which on a tear-out-and-replace is often the largest line on the bid. These are modelled figures — we price firm after seeing access.
Why is there a job minimum?
Every pour carries a fixed cost regardless of size — the truck, the crew, and a pump if the mixer cannot reach the forms. Our minimum is $1,850, and below roughly 150 square feet that minimum is effectively the price. If you have a second small job, pouring both on one visit is the way to get value out of the mobilisation.
How long before I can drive on new concrete?
Walk on it after about 24–48 hours, drive a passenger car on it after about seven days, and keep heavy vehicles off for 28 days. Concrete keeps gaining strength over that whole period — it is not simply dry or not dry.
Will it crack?
All concrete cracks; the work is controlling where. Properly spaced control joints give it a planned place to move. What is avoidable is random structural cracking, and in Sacramento that almost always traces to inadequate base preparation on expansive clay rather than to the concrete itself.
Do I need a permit for a driveway or patio?
Often yes, and if the work touches the sidewalk or the driveway approach you will usually also need an encroachment permit, because that strip is typically city property. We handle both and pay the fees at cost.